Theseus Investment
Research Advisors

Models · AI Credit Cycle

CoreWeave Funding Bridge and Debt Register

14 October 2026CoreWeave Inc.Download

USD millions unless stated otherwise. Research as of 14 October 2026. Selected case: thesis stress. The sheets below are the workbook as saved; the download carries the live formulas and the case switch.

Summary

Summary

USD millions unless stated otherwise | Research as of 14-Oct-2026

Case selected:

Decision outputSelected result

First quarter below analytical cash buffer

Financing needed for buffer in that quarter

Financing needed to avoid negative cash

Peak cumulative buffer funding requirement

June debt with parent exposure

June non-recourse debt

GPU collateral shortfall: illustrative

Hypothetical $10m CDS: two-year cost

Hypothetical CDS: gross event payout

Executable protection quoteNot obtained
Quarterly liquidity before remedial financingQ3:26 EQ4:26 EQ1:27 EQ2:27 EQ3:27 EQ4:27 EQ1:28 EQ2:28 EQ3:28 EQ4:28 E

Cash / cumulative unfunded balance

Funding required for $1bn buffer

Interpretation: a funding requirement is conditional on the selected cash spending and financing assumptions, not a prediction of default.

The stress case permits full modeled facility drawings and includes September net convertible cash, but assumes no new uncommitted financing.

Parent guarantees are not additional consolidated resources. Project rent backstops cannot be netted against CoreWeave parent funding needs.

WULF Compute now has a sourced completion-funding estimate; other project gaps and guaranteed recoveries remain unresolved.

A CDS payment requires a covered credit event; weaker GPU resale prices, lower profits or a cash forecast shortfall alone are insufficient.

Priority 1: refresh actual cash, equipment-payable settlement dates, exact monthly debt service and committed draw conditions.

Priority 2: obtain project cost-to-complete certificates, restricted-account waterfalls and hall-level guarantee activation evidence.

Priority 3: match GPU tranche amortization to acceptance, contract expiry, remarketing rights and independent resale bids.

Priority 4: secure firm CDS terms and access; do not assign basket weights before reference-entity and price verification.

Completion funding update

WULF baseline need before future receipts

WULF stress need before parent support

WULF figures use rounded June balances, exclude parent-funded fit-out, and assume no future receipts or incremental sponsor contribution.

CoreWeave Q4 funding need rises after adding estimated November / December amortization on additional DDTL 5.0 drawings.

Cipher priced new funding today. This is evidence of potential financing access; proceeds are not counted as settled cash.

Assumptions

Assumptions

USD millions unless stated otherwise | Research as of 14-Oct-2026

Select case: 1 stress / 2 continued funding / 3 severe1
Q3:26 EQ4:26 EQ1:27 EQ2:27 EQ3:27 EQ4:27 EQ1:28 EQ2:28 EQ3:28 EQ4:28 E

Revenue

Thesis stress3,3004,0004,2004,4004,6004,8005,0005,2005,4005,600
Continued funding3,3004,4005,5006,5007,5008,5009,50010,50011,50012,500
Severe stress3,0003,4003,4003,3003,2003,2003,2003,2003,2003,200

Cash margin before fixed rent / interest

Thesis stress60%60%60%60%60%60%60%60%60%60%
Continued funding70%70%70%70%70%70%70%70%70%70%
Severe stress50%50%50%50%50%50%50%50%50%50%

Net deferred revenue contribution

Thesis stress4503000(200)(200)00000
Continued funding600700800800800800800800800800
Severe stress2000(300)(300)(200)00000

Other working-capital cash outflow

Thesis stress100150250200150100100100100100
Continued funding100100100100100100100100100100
Severe stress300300300300300300300300300300

Cash capex excluding capitalized interest

Thesis stress9,00010,0007,0006,0005,0004,0003,0003,0003,0003,000
Continued funding9,00010,00010,00010,00010,00010,0008,0008,0008,0008,000
Severe stress9,0008,0005,0003,0002,0002,0002,0002,0002,0002,000

Additional fixed rent beyond June schedule

Thesis stress01002504005507008009001,0001,100
Continued funding01003005007009001,1001,3001,5001,700
Severe stress0100250400550650700750800850

Other investing outflow

Thesis stress100100100100100100100100100100
Continued funding100100100100100100100100100100
Severe stress100100100100100100100100100100

RCF cash draws

Thesis stress1,20076700000000
Continued funding1,20076700000000
Severe stress1,20076700000000

DDTL 3 cash draws

Thesis stress385000000000
Continued funding385000000000
Severe stress385000000000

DDTL 4 cash draws

Thesis stress2,0002,0001,6630000000
Continued funding2,0002,0001,6630000000
Severe stress2,0001,50000000000

DDTL 5 cash draws

Thesis stress1,999000000000
Continued funding1,999000000000
Severe stress1,000000000000

DDTL 5.5 cash draws

Thesis stress1,2001,40000000000
Continued funding1,2001,40000000000
Severe stress1,200000000000

Future uncommitted debt funding

Thesis stress0000000000
Continued funding08,0006,0006,0006,0006,0004,0004,0004,0004,000
Severe stress0000000000

June debt annual cash interest rate

Thesis stress8%8%8%8%8%8%8%8%8%8%
Continued funding8%8%8%8%8%8%8%8%8%8%
Severe stress8%8%8%8%8%8%8%8%8%8%

New drawings annual cash interest rate

Thesis stress10%10%10%10%10%10%10%10%10%10%
Continued funding10%10%10%10%10%10%10%10%10%10%
Severe stress12%12%12%12%12%12%12%12%12%12%

New term draw amortization / quarter

Thesis stress005%5%5%5%5%5%5%5%
Continued funding005%5%5%5%5%5%5%5%
Severe stress005%5%5%5%5%5%5%5%

Reserve cash funded

Thesis stress11201480000000
Continued funding11201480000000
Severe stress11207.50000000

Minimum analytical cash buffer

Thesis stress1,0001,0001,0001,0001,0001,0001,0001,0001,0001,000
Continued funding1,0001,0001,0001,0001,0001,0001,0001,0001,0001,000
Severe stress1,0001,0001,0001,0001,0001,0001,0001,0001,0001,000

Cash margin includes variable leases, cash taxes and operating costs; fixed rents and interest are deducted separately.

Cash capex includes settlement of equipment payables but excludes capitalized interest; all cash interest is shown separately.

Draws are conditional, not cash on hand. Full availability is assumed in case 1; case 3 restricts draws.

New term amortization is a proxy: 5% of cumulative original draws quarterly from Q1:27; replace with lender schedules.

Future financing is uncommitted and uses an interest-only proxy within the forecast horizon; no equity issuance assumed.

Reserve is conservatively cash-funded; eligible letters of credit could reduce cash use. Buffer is an analytical choice, not a covenant.

No additional coupon step-ups, commitment fees or Sept offering expenses are forecast separately; add to other cash outflows if known.

DDTL 5.0 repayment timing on post-June drawings

Annual original-balance amortization proxy20%
Q4:26 payment months: November / December2

November start is reported in the June 10-Q. The 20% annual amount is an assumption, not the unavailable lender schedule.

Applies only to post-June DDTL 5.0 drawings; June debt repayment buckets already include service on existing principal.

Other new drawings retain the quarterly proxy from Q1:27. Average-quarter cash interest is still an approximation.

CoreWeave CF

CoreWeave CF

USD millions unless stated otherwise | Research as of 14-Oct-2026

Case selected:

Cash-flow forecastQ3:26 EQ4:26 EQ1:27 EQ2:27 EQ3:27 EQ4:27 EQ1:28 EQ2:28 EQ3:28 EQ4:28 E

Revenue

Cash generation before fixed rent / interest

Net deferred revenue contribution

Other working-capital outflow

Commenced operating lease cash

Additional fixed rent

Cash interest on June debt

Cash interest on new facility drawings

September convertible cash coupon

Operating cash after interest / rent

Cash capex excluding capitalized interest

Other investing cash outflow

Cash flow before financing / principal

June debt scheduled principal

New term draw scheduled principal

Finance lease cash (principal and interest)

Debt / lease cash service total

June facilities cash draws

DDTL 5.5 cash draws

Future uncommitted debt cash proceeds

September convert net cash after capped call

Incremental restricted reserve cash

Opening unrestricted cash + securities

Net change before remedial financing

Closing cash before remedial financing

Cumulative financing required to reach zero

Cumulative financing required for buffer

Buffer breached (1 = yes)

June debt closing principal

New term facilities cumulative original draws

New term facilities closing principal

RCF / future debt closing principal

New debt closing principal excl Sept convert

Forecast is an analytical liquidity statement, not a GAAP statement: all cash interest and finance lease payments are shown once.

Negative balances mean unmet cumulative financing needs; they do not imply the business could continue operating with negative cash.

Annual June principal / lease buckets are allocated evenly across quarters. Exact payment dates can move the first-gap quarter.

Consolidated availability overstates parent flexibility if subsidiary distributions are restricted. Restricted opening cash is excluded.

No automatic capex cancellation, asset sales, restructuring, equity cure or sponsor rescue is assumed beyond the selected drivers.

Incremental reserve funding covers DDTL 5.5 only. Other facility reserve increases and fees are not fully quantified and could enlarge the gap.

Q4:26 now includes two months of assumed amortization on post-June DDTL 5.0 drawings; exact Schedule 2.08 remains unavailable.

Debt register

Debt register

USD millions unless stated otherwise | Research as of 14-Oct-2026

FacilityBorrower / obligorJune principalParent exposureMaturityTerms
DDTL 1.0CCAC II1,300Parent guaranteeMar-2028Secured; 15% effective rate at June
DDTL 2.0CCAC IV3,190Parent guaranteeAug-2030Secured; 11% effective rate at June
DDTL 2.1CCAC IV3,000Parent guaranteeMar-2031Secured; 9% effective rate at June
DDTL 3.0CCAC V / VII2,215Parent guaranteeAug-2030Secured; $385m undrawn at June
DDTL 5.0CoreWeave Financing DDTL V1,101Parent guaranteeNov-2031SOFR + 4.5%; monthly amortization begins Nov-2026
2030 senior notesCoreWeave Inc.2,000Direct parent debtJun-20309.25%; unsecured
2031 senior notesCoreWeave Inc.1,750Direct parent debtFeb-20319.00%; unsecured
2031 senior notesCoreWeave Inc.2,750Direct parent debtOct-20319.75%; unsecured
2032 senior notesCoreWeave Inc.1,250Direct parent debtJul-20329.625%; unsecured
2032 EUR senior notesCoreWeave Inc.2,279Direct parent debtJul-20328.50%; USD carrying principal; FX risk
2031 convertible notesCoreWeave Inc.2,588Direct parent debtDec-20311.75%; unsecured
2032 convertible notesCoreWeave Inc.4,000Direct parent debtOct-20321.75%; unsecured
Revolving credit facilityCoreWeave Inc.0Direct parent debtNov-2029$2500m capacity less $533m letters of credit at June
OEM / software financing: recourseVarious subsidiaries4,220Recourse per filingDec-2026 to Jul-2030Vendor agreements; instrument-level guarantor detail required
Magnetar noteParent / affiliate arrangement189Recourse per filingJan-2029Confirm holder and surviving claim at trade date
DDTL 4.0CCAC VIII2,837Non-recourse; limited carve-outsMar-2032Secured; $5663m undrawn; restricted three-month coverage reserve
OEM financing: non-recourseFinancing subsidiaries882Non-recourseAug-2026 to Aug-2028GPU collateral; vendor agreement schedules required

June total principal

Recourse / direct parent

Non-recourse

Difference to reported total

Subsequent facilityBorrowerCapacity / faceParent exposureMaturityTerms
DDTL 5.5CoreWeave Financing DDTL V-V2,600Unconditional parent guaranteeSep-2031SOFR + 5.5%; draws through Dec-2026; approx 3-year contracts
Sept convertibleCoreWeave Inc.4,200Direct parent debt20332.875%; net cash after capped calls $3570.8m, before other expenses
June contractual principal bucketH2:262027202820292030Later
Scheduled principal4,4136,1844,4162,4213,22114,896

Source: CW 10-Q Note 10 and August / September agreements; links in Evidence. Borrower shorthand must be checked against executed documents.

DDTL 5.5: reserve initially $112.5m, later max(10% of outstanding principal, $112.5m), subject to contractual exceptions.

Replacement / renewed contracts face DSCR and contract-value tests; do not equate a test failure with immediate payment default.

Monthly amortization is set by schedules; unavailable exact future schedules are estimated in the consolidated model.

Parent guarantees move subsidiary risk to the parent. They do not add outside cash to the consolidated borrower.

A default at a non-recourse subsidiary need not trigger parent CDS. Cross-default, threshold, guarantee and credit-event language matter.

The filing identifies $18.2bn noncurrent and $2.6bn current assets supporting constrained financing entities. Do not assume fungibility.

DDTL 5.0 Section 2.08 ties principal payments to Schedule 2.08 and outstanding debt at commitment termination.

The public exhibit inspected lists Schedule 2.08 but does not supply the percentage table. The model cannot reproduce exact lender payments.

Projects

Projects

USD millions unless stated otherwise | Research as of 14-Oct-2026

Project / issuerDebt faceCouponDelay interestCost to completeUsable project cashDrawable supportStressed funding gap
Lake Mariner / WULF Compute3,2008%1,7001,5000
Barber Lake / Cipher Compute1,7337%
Black Pearl Compute2,0006%
River Bend / Hut 8 DC LLC3,2506%
Beacon Point / Beacon Point DC LLC4,2506%
Stingray Compute / Cipher8106%
Illustrative construction delay, months6
Cost overrun on remaining spend15%

WULF Compute cash and remaining capex are now sourced, rounded June figures. Other yellow inputs remain unavailable.

WULF support input of zero is a stress assumption: no parent funding, future rent or reserve surplus is credited. It is not zero legal support.

Restricted project cash, debt-service reserves and sponsor cash have different permitted uses; group balances cannot fill these inputs.

Project / supportActivation / timingCovered risk
Lake Mariner$600m Google support effective after CB-3 delivery in early July 2026Fluidstack lease support; not a general construction-cost guarantee.
Lake Mariner CB-4 / CB-5Phased deliveries expected H2:26 / early 2027TeraWulf provides completion guarantees; quantify its remaining funding obligation and capacity.
Barber LakeTenant beneficial use reported August; exact activation certificate neededGoogle backstop up to $1.73bn; declining lease support, not unrestricted cash.
Black PearlInitial capacity delivered / rent began August 2026Amazon.com guarantees base rent and operating expenses; construction completion still matters.
River BendInitial hall delivery targeted Q2:27Google backs Fluidstack lease obligations; confirm commencement and termination-payment conditions.
Beacon PointInitial hall delivery targeted Q3:27Project debt non-recourse to Hut parent; confirm tenant guarantee and draw conditions.
Group liquidity at June 2026UnrestrictedRestrictedScope
TeraWulf2,619409Consolidated; not parent-only
Cipher8323,728Across projects; not fungible
Hut 82346,787Primarily project accounts

Cipher supplier commitments: $2169.3m. This is not a complete project cost-to-complete estimate; accrued construction may overlap.

Do not count guarantee face value as cash that absorbs a construction funding gap. Eligible claims, caps, timing and recoverability are required.

River Bend pre-issuance illustration20272028202920302031
NOI171373384395407
Expensed construction830000
Operating interest51202197190183
Principal amortization06396112128

Residual cash from rounded inputs

30% NOI haircut, before backstop

Illustrative NOI haircut30%

Issuer April 2026 illustration, not current guidance or final indenture amortization; rounded inputs can differ from shown residuals by $1m.

This scenario shows cash before lease support. It is not a forecast of net creditor loss or a reason to short a Google-backed claim.

Sources: TeraWulf Q2 release; Cipher Q2 10-Q / Feb presentation; Hut Q2 release, River Bend April presentation and closing 8-K.

Lake Mariner: Google warrants are pledged before lease commencement, then released; their stressed value is not fixed cash protection.

Google affiliate also undertakes termination-fee payment under recognition agreements. Caps, triggers and payment dates require contract review.

WULF Compute completion funding: June snapshot, not a payment-date forecast

Baseline remaining capex less adjusted cash

Assumed cost overrun

Assumed incremental delay interest

Total before parent funding / future receipts

TeraWulf parent cash at June, rounded1,200Parent cash is not fully dedicated to Lake Mariner.
July first JV-sale payment, excluded from June250
Parent cash plus July payment, before other usesRounded arithmetic; not an updated cash balance.

Required allocation / parent pro forma cash

Source: TeraWulf Q2 investor presentation, slide 20. $1.9bn project cash less $0.4bn DSRA / construction-interest reserves = $1.5bn.

Remaining capex of $1.7bn excludes parent-funded tenant fit-out, later recovered through increased rent. Fit-out increases interim funding needs.

The $579m stress adds 15% to remaining spend and six months of gross coupon interest. No unused IDC reserve is assumed available for the delay.

Future rent receipts, parent contributions and reserve release may cover part of the requirement. Neither their amount nor payment timing is established here.

TeraWulf completion guarantees and Google lease support are separate. Parent support capacity depends on other development and corporate obligations.

Presentation values are rounded; $200m / $579m are approximate scenario amounts, not precise shortfall claims.

CB-4 / CB-5 delivery targets span H2:26 and early 2027. Monthly cost-to-complete and rent schedules are required to locate a funding quarter.

Cipher funding update: priced, not settled at the research cutoff

14-Oct-2026: $850m of zero-coupon senior unsecured convertibles due 2032 priced; $150m purchaser option. Scheduled closing: 16-Oct-2026.

Concurrent exchange expected: approximately $165.9m of 2030 notes for approximately 40.7m shares. It is not a cash repayment in this announcement.

Do not add gross proceeds to June liquidity or project reserves. Closing, net proceeds and allocation must be confirmed.

Stingray: $810m 6% notes closed June 15; $61.5m sponsor reimbursement and reserves reduce gross proceeds available for remaining construction.

Stingray coupons are due June 15 / December 15, beginning December 2026; maturity June 2031. Project cost-to-complete remains unavailable.

Cipher announced cash proceeds: conditional on closing

Estimated proceeds after purchaser discount835
Capped-call cost89.7

Remaining before other offering expenses

Uses include additional equity for Barber Lake and wider development. No project-specific allocation is disclosed; do not count all $745.4m as Barber support.

Although stated maturity is 2032, holders may require a cash repurchase on November 1, 2030. Include that put in any maturity analysis.

The $150m option and incremental capped calls are excluded. The expected 2030-note share exchange is separate from these cash proceeds.

GPU stress

GPU stress

USD millions unless stated otherwise | Research as of 14-Oct-2026

DDTL 5.5 residual-value stressInput / resultBasis
Fully drawn debt2,600Analyst assumes full facility draw
Advance rate on original asset cost80%Analyst assumption; not reported LTV
Original equipment costDebt divided by assumed advance rate
Customer contract term, years3Average reported; actual contracts vary
Debt maturity, years5Approximate reported tenor
Annual amortization of original debt20%Analyst proxy; replace with contractual schedule
Debt remaining at contract endOriginal debt less assumed amortization
Resale value / original equipment cost30%Analyst stress; not a vendor quote
Selling / liquidation cost10%Analyst stress
Net equipment proceedsResale less disposal costs
Collateral shortfall before parent guaranteeDebt remaining less net equipment proceeds
Parent guarantee recoverable amountNot established; correlated with parent solvency
Initial project DSCR1.5Analyst assumption
Operating cash-flow decline20%Analyst assumption
Stressed DSCRCash decline; unchanged debt service
Reference DSCR threshold1.35Agreement; full tests and cure terms apply

At 20% annual original-balance amortization, 40% remains after three years. A five-year loan is not automatically a five-year bullet.

Refinancing / re-leasing requirements and parent support matter alongside liquidation value. Covenant stress is not necessarily a CDS event.

IREN Microsoft GPU financingValueInterpretation
DDTL funded at June413SOFR + 2.25%; monthly principal; conditional milestone draws
Private-placement notes funded5255.96%; monthly principal; escrow release conditions
Pledged equipment net book value1,487Accounting carrying value, not liquidation value

Funded debt / equipment book value

IREN financing generally non-recourse, with limited parent guarantees tied to pre-acceptance termination and certain hedges.

Acceptance can release parent guarantees; each tranche needs its own acceptance date, debt schedule and customer contract cash waterfall.

Sources: CoreWeave DDTL 5.5 agreement / release; IREN June 2026 annual filing. Exact lender amortization tables remain necessary.

CDS economics

CDS economics

USD millions unless stated otherwise | Research as of 14-Oct-2026

Hypothetical CDS tradeInput / resultStatus
Notional, USD millions10Illustrative; not a minimum dealer size
Running annual coupon5%Illustrative standardized coupon
Upfront premium, % of notional8%Illustrative; not a live quote
Holding horizon, years2Assumes no-event hold to horizon
Recovery on credit event20%Scenario; actual auction recovery can differ
Fees / other cash costs0Placeholder; excludes margin funding and slippage
Annual running premiumNotional times coupon
Upfront cash premiumNotional times upfront
Two-year no-event cash costUpfront plus running premium plus fees
Gross credit-event payoutNotional times loss given default
Net profit if event at horizonPayout less assumed costs
Simplified break-even event probabilityCost divided by payout; not a valuation model

No executable dealer quote obtained. CoreWeave five-year CDS was publicly reported at 505bp on 12-Nov-2025; this is historical only.

Market existence does not establish current liquidity, your account eligibility, obtainable notional or correct reference obligation.

Project-SPV CDS availability is unverified. Parent CDS is not interchangeable with protection on a non-recourse project.

No dealer has been contacted. A real contract and cost cannot be asserted until an eligible account receives a firm quote.

Dealer request / access checkRequired specification
Reference entityCoreWeave Inc.; exact legal name, RED identifier, seniority and reference obligation
Tenor and sizeRequest 3Y and 5Y; sample sizes $1m / $5m / $10m, subject to dealer minimums
PriceTimestamped firm bid/offer: upfront points, coupon, accrued premium and quote validity
Credit eventsBankruptcy / failure to pay / restructuring elections, thresholds, grace periods and guarantees
SettlementAuction / cash / physical terms, deliverable obligations, succession and settlement currency
Account accessJurisdiction, investor category, dealer onboarding, documentation and permitted product scope
CollateralISDA / CSA, initial and variation margin, thresholds, eligible collateral and funding cost
ExitFirm unwind quote / bid-offer at stated size; stressed liquidity and termination provisions
Basket decisionSingle-name CDS basket requires each name to be independently tradeable; avoid substituting correlated equity proxies

Cost illustration ignores discounting, early premium cessation, accrual convention and mark-to-market unwind; it is a cash-budget example.

Risk ranking: first test CoreWeave parent exposure; research project completion and GPU tranches separately before assigning basket weights.

Market update: separate observed credit stress from executable CDS pricing

Bloomberg, 14-Oct-2026, reports CoreWeave 2032 unsecured bonds below 80 and yielding over 15%, citing TRACE trades.

A bond yield is not a CDS premium. It cannot replace dealer upfront points, running coupon, bid/offer and settlement terms.

A secondary automated report claims near-1000bp CDS today; not independently verified, so it is excluded from the trade calculator.

The prior 5% coupon / 8-point upfront example remains illustrative and must not be read as current obtainable pricing.

Provided for informational purposes only; not investment advice or an offer or solicitation. Scenario outputs are analyst assumptions, not forecasts of default. Affiliates of Theseus may hold long or short positions, including credit default swaps, in the companies discussed. See Disclaimers.